Yard VarianceGet a packet

How to get a zoning variance in Ohio

You apply to your city's Board of Zoning Appeals, pay a small fee, and explain at a public hearing why the rule doesn't fit your lot. For a size, height or setback request, Ohio boards ask whether the rule causes you a practical difficulty. Most of the work is the paperwork: the form, a drawing to scale, and a short written case.

What a variance is

Your zoning code says what you can build without asking: how tall a fence can be, how big a shed, how close to the road a deck can sit. A variance is written permission to go past one of those numbers on your lot. It does not change the rule for anyone else.

Ohio law lets a city or village set up a board to hear these requests. The statute says the board may “permit exceptions to and variations from the district regulations” (Ohio Revised Code 713.11). Most cities call it the Board of Zoning Appeals, or BZA. Townships have their own version of the same power (ORC 519.14).

There are two kinds, and the difference matters:

  • Area variance. A number: height, size, setback, lot coverage. Taller fence, bigger garage, deck closer to the road. This is almost every homeowner request.
  • Use variance. Doing something the district doesn’t allow at all, like running a shop in a house. Much harder to get, and not what this guide is about.

The standard you have to meet

For an area variance, the Ohio Supreme Court set a lower bar than for a use variance. You do not have to prove “unnecessary hardship.” You have to show a “practical difficulty” (Kisil v. Sandusky, 1984, 12 Ohio St.3d 30). Two years later the court listed the things a board should weigh (Duncan v. Village of Middlefield, 1986, 23 Ohio St.3d 83). In the court’s words:

A property owner encounters “practical difficulties” whenever an area zoning requirement (e.g., frontage, setback, height) unreasonably deprives him of a permitted use of his property.Duncan v. Village of Middlefield, syllabus

In plain words: the rule, applied to your lot, gets in the way of something you should be able to do, and your ask is reasonable. The seven Duncan factors and how to write to them are in the practical-difficulty guide. Your own city’s code may add factors of its own; Brecksville lists nine.

The steps

  1. Find out exactly what you need a variance from. Call the building department. Ask for the section number and the number in it (“1185.03(a), four feet”). Your application and the board’s motion will both name that section.
  2. Get the application. Some cities file online, some on paper, some both. Brecksville takes it through its Citizenserve portal plus one hard copy, and charges $50 for the first variance on a parcel and $15 for each additional one (city BZA page).
  3. Draw a site plan to scale. Your lot lines, the house, the driveway, and the thing you want to build with its distances to the lot lines. Brecksville wants it to scale, and as a PDF if it is bigger than 11 by 17.
  4. Write the practical-difficulty statement. Half a page to a page. What you want, what the code says, why your lot makes the rule a problem, what else you tried, and why your ask is the smallest that solves it.
  5. Talk to the neighbors before the city does. Ohio boards mail notice to the people next door; Brecksville’s code requires notice to adjacent owners, the owners across the street, and at least five neighboring properties (Section 1197.22 in the city’s zoning code). A letter of support in the file beats a surprised neighbor at the microphone.
  6. File by the deadline. Boards meet monthly and set a filing deadline ahead of each meeting. Miss it and you wait a month.
  7. Go to the hearing and present it yourself. The board asks questions. The owner is the one who can answer them. More on this below.
  8. Wait for the final vote, if your city has one. In some cities the board’s decision is a recommendation. In Brecksville, a variance the board grants is “subject to review and approval by Council before becoming effective” (Section 1197.42), and Council votes the following Tuesday.
  9. Then pull the building permit. The variance lets you apply for the permit; it is not the permit.

What happens at the hearing

The clerk reads your request. You (or whoever you send) explain it. Board members ask questions. Neighbors can speak. Then a member makes a motion and the board votes by roll call.

Reading a year of one board’s minutes, the questions repeat. Is there a document behind the claim (a vet letter, an installer’s manual, an engineer’s review)? Is this the smallest ask that solves it? What do the neighbors say? Was there another spot or a shorter fence that would work? The same request can go either way depending on who answers. This is the clearest example in the record:

  • BZA26-000001

    June 8, 2026 · 9555 Reserve Run

    6' fence, 480 feet of it. Code says 4'.

    Said: the dog; wildlife; safety.

    The fence company presented. The homeowner came back himself in July.

    denied2–3
  • BZA26-000011

    July 13, 2026 · 9555 Reserve Run

    6' fence on part of the yard. Code says 4'.

    Said: a large German Shepherd; the vet said 4' would not hold him; deer and turkeys crossing the yard.

    Second try, narrower ask, with photos and documentation the board called thorough. Denied a month earlier.

    approved4–2

In July the minutes note that board members “complimented the thoroughness of the application materials, photographs, supporting documentation, and overall presentation.” Same yard, same dog, different preparation.

Boards also bargain in the room. When a Brecksville couple asked for a 6-foot driveway gate, the board asked for 4 feet and they settled on 5 on the spot (BZA26-000007, approved 4–2 then 6–0). Know before you walk in what you could live with.

How many votes it takes

A motion can fail even when more members vote yes than no. Brecksville’s code requires “the concurring affirmative vote of at least four members” for any decision (Section 1197.42). In June 2026, with two members absent, a fence request lost 3–2 and a driveway request lost 3–2. Both came back later; the driveway passed in July with a smaller plan. Ask the clerk how many members will be there.

  • BZA26-000004

    June 8, 2026 · 6590 Summer Wind Dr

    6' aluminum fence, 295 feet. Code says 4'.

    Two members were absent; three ayes was not enough. It is back on the September agenda.

    denied3–2
  • BZA26-000005

    June 8, 2026 · 10126 Echo Hill Dr

    Turn a whole tennis court into driveway.

    Two members absent; three ayes was not enough. Came back smaller in July and passed.

    denied3–2

If you already built it

Ohio law lets the city, or a neighbor, go to court to stop or undo a structure that violates the zoning code (ORC 713.13). Building first and asking later does not help your case; one Brecksville applicant told the board his fence had gone up without the needed approvals after he relied on his contractor, and he had to make the case anyway (he won 4–2). If a contractor tells you they will “handle the permit,” ask whether that includes the variance hearing. Usually it does not, and the owner is the applicant of record.

Want the packet built?

The form filled in, a sketch to scale on an overhead of your lot, a practical-difficulty statement that cites your board’s own decisions, and a one-pager for the night. Delivered in 2 days.

Get your packet, $199